|
List of Projects in Indonesia
Category A
Category B
JBIC's Project Categorization
JBIC puts projects
into one of four categories, A, B, C, or FI, in accordance
with the extent of the environmental impact(s) and/or JBIC's
involvement in the project. Category A and B projects are
expected to have significant impacts on the environment (for
more detailed explanations, see
JBIC page
Below is a list of all the projects that JBIC has classified
as Category A or B since JBIC's
new guidelines were established on October 1, 2002. (The
full implementation of the guidelines started on October 1,
2003.) @This list is a translation of the list provided in
Japanese on JBIC's official website.
You can inquire to JBIC for more information on each project,
with the Inquiry Number indicated below.
E-mail inquiries to JBIC: kankyoshakai@jbic.go.jp
Category A Projects
| Tanjungpriok
Harbor Access Road Construction Project |
| Location |
Jakarta |
| Inquiry No. |
2004-201 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 15, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline
and Sector |
To construct the Tanjungpriok Harbor Access Road (sky
toll way) |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
This project falls under the large road sector illustrated
by guideline |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
fully applied |
| Additional
Information |
@ |
| Ulubelu
Geothermal Power Plant Construction Project |
| Location |
Lampung Province |
| Inquiry No. |
2004-203 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline
and Sector |
(1) Geothermal Power Plant Construction Project
(2) Constructionof electrical feeder line and transforming
station |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
severe impact on environment |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
fully applied |
| Additional
Information |
@ |
| Asahan
Third Hydroelectric Power Plant Construction Project |
| Location |
Northern Sumatra Province |
| Inquiry No. |
2004-202 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline
and Sector |
(1) Influx Type Power Generating Unit
(2) Installment of electrical feeder line |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
large hydroelectric power plant |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
fully applied |
| Additional
Information |
@ |
| Down
Stream of Solo River Improvement Project (2) |
| Location |
Java Province |
| Inquiry No. |
2004-208 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline
and Sector |
to establish flood-warning-system and river improvement,
of balancing reservoir construction, weir construction,
and irrigation channel for flood control |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
large reservoir |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional
Information |
@ |
| Combined
cycle generating plant |
| Location |
Java |
| Inquiry No. |
2004-079 |
| Loan Scheme |
IFO |
| Date of information disclosure
on JBIC Website |
November 12, 2004 |
| Present
Status of Project |
Loan Agreement was signed |
| Project Outline and Sector
|
Construction and operation of Combined cycle generating
plant |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
This project falls under the large-scale generating
power plant sector illustrated by Guideline. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
@ |
| Application of New JBIC
Guidelines |
fully applied |
| Additional
Information |
|
| Tanjung
Priok Port Rehabilitation Project |
| Location |
Jakarta |
| Inquiry No. |
2004-038 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
March 2, 2004 |
| Present
Status of Project |
Loan Agreement was made on March 31, 2004 |
| Project Outline and Sector
|
Improvement of navigational condition by deepening and
widening of the channel |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
Large-scale ports |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
@ |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
oFA
Long List of Future Candidate Projects for Indonesia |
| Lahendong
Geothermal Power Plant Project |
| Location |
Lahendong, Minahasa, North Sulawesi |
| Inquiry No. |
2004-034 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
March 2, 2004 |
| Present
Status of Project |
Loan Agreement was made on March 31, 2004 |
| Project Outline and Sector
|
To install 20 MW geothermal power plant nearby existing
plant |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
Sensitive characteristics |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
Environmental Monitoring Plan and Environmental Management
Plan |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
MoFA
Long List of Future Candidate Projects for Indonesia |
| Tanjung
Priok Combined Cycle Power Plant Project |
| Location |
Jakarta |
| Inquiry No. |
2004-033 |
| Loan Scheme |
ODA |
| Date of information
disclosure on JBIC Website |
March 2, 2004 |
| Present
Status of Project |
Loan Agreement was made on March 31, 2004 |
| Project Outline and Sector
|
To build combined cycle gas thermal power plant having
capacity of 720MW |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
Large-scale thermal power |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
MoFA
Long List of Future Candidate Projects for Indonesia |
| Gas
Development Project |
| Location |
South Sumatra |
| Inquiry No. |
2003-158 |
| Loan Scheme |
IFO |
| Date of information
disclosure on JBIC Website |
October 10, 2003 |
| Present
Status of Project |
Loan Agreement was made on January 14, 2005 |
| Project Outline and Sector
|
Gas development |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
Large-scale oil and natural gas development |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
@ |
Category B Projects
| Expansion
project of Keramasan Generating Power Plant |
| Location |
South Sumatra Province |
| Inquiry No. |
2004-205 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline
and Sector |
To establish new steam turbine in the existing generating
power plant, which make it combined-cycle |
| Reasons for
Category Classification (Based on gIllustrative list of
Sensitive Sectors, Characteristics and Areash of Guidelines)
|
The project does not fall under the sensitive characteristics
and area and thus does not have significant adverse impact
on environment. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
fully applied |
| Additional
Information |
@ |
| Facalty
of Healthcare and medicine, National Islamic University |
| Location |
Banten Province |
| Inquiry No. |
2004-209 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline
and Sector |
1) Construction of School building of Facalty of Healthcare
and Medicine
2) Provision of equipment
3) Overseas education programme |
| Reasons for
Category Classification (Based on gIllustrative list of
Sensitive Sectors, Characteristics and Areash of Guidelines)
|
The project does not fall under the sensitive characteristics
and area and thus does not have significant adverse impact
on environment. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
fully applied |
| Additional
Information |
@ |
1)
Integral management of landslide disaster and regional
development in
Merapi Mt. and Progo river basin, 2) Project of emergency
countermeasure against breakdown of Mt. Bawakaraeng |
| Location |
1) Jogjakarta Special Province and Mid-Java
Province, 2) Mt. Bawakaraeng, Soutehrn Sulawesi Province |
| Inquiry No. |
2004-200 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline
and Sector |
1) Construction of check dam, establishment of sediment
stockyard, rehabilitation of irregation wier
2) Construction of check dam, rehabilitation of existing
check dam, and dredging sedimentation |
| Reasons for
Category Classification (Based on gIllustrative list of
Sensitive Sectors, Characteristics and Areash of Guidelines)
|
The project does not fall under the sensitive characteristics
and area and thus does not have significant adverse impact
on environment. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
1) partially applied
2) fully applied |
| Additional
Information |
@ |
| Project
of easing congestion in Nortern Java Arterial Highway
|
| Location |
Eastern Java Province, Banten Province,
and Western Java Province |
| Inquiry No. |
2004-206 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline and Sector
|
to construct six elevated bridges in Northern Java Arterial
Highway and its alternatives |
| Reasons for
Category Classification (Based on gIllustrative list of
Sensitive Sectors, Characteristics and Areash of Guidelines)
|
The project does not fall under the sensitive characteristics
and area and thus does not have significant adverse impact
on environment. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
@ |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional
Information |
@ |
| The
Secondary Stage of Komering Irrigation Project Phase II |
| Location |
South Sumatra Province |
| Inquiry No. |
2004-199 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
December 1, 2004 |
| Present
Status of Project |
JBIC'snvironmental review is ongoing. |
| Project Outline and Sector
|
Irrigation improvement for existing arable land iimprovement
for secondary channel, auxiliary secondary channel and
edgej |
| Reasons for
Category Classification (Based on gIllustrative list of
Sensitive Sectors, Characteristics and Areash of Guidelines)
|
The project does not fall under the sensitive characteristics
and area and thus does not have significant adverse impact
on environment. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional
Information |
@ |
| Jakarta
Fishing Port Rehabilitation Project |
| Location |
Jakarta |
| Inquiry No. |
2004-037 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
March 2, 2004 |
| Present
Status of Project |
Loan Agreement was signed on March 31, 2004 |
| Project Outline and Sector
|
To rehabilitate the quay wall structure for maintaining
the function of the Port |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
This project is not a large-scale port project indicated
in the Illustrative list of the guidelines |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
@ |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
MoFA
Long List of Future Candidate Projects for Indonesia |
| Rehabilitation
and Gasification of Semarang Steam Power Plant Project |
| Location |
Semarang, Central Java |
| Inquiry No. |
2004-035 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
March 2, 2004 |
| Present
Status of Project |
Loan Agreement was signed on March 31, 2004 |
| Project Outline and Sector
|
Rehabilitation and gasification of the 2nd Semarang
Steam Power Plant |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
This project is not a large-scale thermal power project
indicated in the Illustrative list of the guidelines |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
@ |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
MoFA
Long List of Future Candidate Projects for Indonesia |
|