List of Projects in Viet Nam
Category A
Category B
JBIC's Project Categorization
JBIC puts projects
into one of four categories, A, B, C, or FI, in accordance
with the extent of the environmental impact(s) and/or JBIC's
involvement in the project. Category A and B projects are
expected to have significant impacts on the environment (for
more detailed explanations, see
JBIC page
Below is a list of all the projects that JBIC has classified
as Category A or B since JBIC's
new guidelines were established on October 1, 2002. (The
full implementation of the guidelines started on October 1,
2003.) @This list is a translation of the list provided in
Japanese on JBIC's official website.
You can inquire to JBIC for more information on each project,
with the Inquiry Number indicated below.
E-mail inquiries to JBIC: kankyoshakai@jbic.go.jp
Category A Projects
| Generating
Power Plant Project |
| Location |
Hai Phong City |
| Inquiry No. |
2005-114 |
| Loan Scheme |
IFO |
| Date of information
disclosure on JBIC Website |
June 21, 2005 |
| Present
Status of Project |
|
| Project Outline
and Sector |
Construcion of Generating Power Plant |
| Reasons for
Category Classification (Based on gIllustrative list of
Sensitive Sectors, Characteristics and Areash of Guidelines)
|
This project falls under the large-scale generating
power plant sector illustrated by Guideline. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Fully applied |
| Additional
Information |
@ |
| Expansion
of Ninh-binh generating power plant |
| Location |
Ninh-binh Cuty, Ninh-binh Province |
| Inquiry No. |
2004-144 |
| Loan Scheme |
ODA |
| Date of information
disclosure on JBIC Website |
November 2, 2004 |
| Present
Status of Project |
JBIC's environmental review is ongoing. |
| Project Outline
and Sector |
Another generating power plant will be constructed adjacent
to the existing Ninh-binh generating power plant located
in Ninh-binh City, Ninh-binh Province, 105km South from
Hanoi. |
| Reasons for
Category Classification (Based on gIllustrative list of
Sensitive Sectors, Characteristics and Areash of Guidelines)
|
This Project falls under the Large-scale thermal power
illustrated in the JBIC's guideline and have
sensitive characteristics. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Fully applied |
| Additional
Information |
@ |
| Regional
Road Network Improvement Project in Northern Hanoi |
| Location |
Nothern Hanoi (Hanoi-Central Highlandj |
| Inquiry No. |
2004-146 |
| Loan Scheme |
ODA |
| Date of information
disclosure on JBIC Website |
Oct. 7, 2004 |
| Present
Status of Project |
JBIC's environmental review is ongoing. |
| Project Outline
and Sector |
Construcion of secondary road and the Third Bypass National
Road for the purpose of improvement of road networ in
Northern Hanoi. |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
The project falls under the road sector illustrateed
by the new guideline and has sensitive characteristic. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Fully applied |
| Additional Information |
@ |
| Urban
Environmental Improvement Project in Hai Phong City |
| Location |
Hai Phong City |
| Inquiry No. |
2004-147 |
| Loan Scheme |
ODA |
| Date of information
disclosure on JBIC Website |
4 Oct 2004 |
| Present
Status of Project |
JBIC's environmental review is ongoing. |
| Project Outline
and Sector |
drainage refurbishment, refurbishment and construction
of balancing reservoir, construction of sewage plant (and
waste disposal and treatment facility etc is under review) |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
The project falls under the category of project that
have significant adverse impact on the environment illustrated
by the Guidline.. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Fully applied |
| Additional Information |
@ |
| Cai
Mep - Thi Vai International Port Construction Project |
| Location |
Ba Ria-Vung Tau |
| Inquiry No. |
2003-194 |
| Loan Scheme |
ODA |
| Date of information
disclosure on JBIC Website |
January 16, 2004 |
| Present
Status of Project |
JBIC's environmental review is ongoing. |
| Project Outline and Sector
|
Construction of new ports, installation of large loading
facilities etc, dredging of the channel and the anchorage |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
- Large-scale ports
- Sensitive characteristics
|
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
MoFA
Long List of Future Candidate Projects for Viet Nam (FY
2003-FY2005) |
| Hanoi
- Ho Chi Minh City Railway Bridges Safety Improvement
Project (V) |
| Location |
44 Bridges located in 1,400km between Hanoi
and Ho Chi Minh City |
| Inquiry No. |
2003-196 |
| Loan Scheme |
ODA |
| Date of information
disclosure on JBIC Website |
December 26, 2003 |
| Present
Status of Project |
Loan Agreement was signed on March 31, 2004 |
| Project Outline and Sector
|
Rehabilitation works for railway 44 bridges on Hanoi
- Ho Chi Minh City Route by both improvement of existing
bridges and construction of new bridges, in order to improve
the safety of railroad service, to increase the transportation
capacity, and to reduce the required time |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
Large-scale involuntary resettlement |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
@ |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
JBIC
press release |
| O
Mon Thermal Power Plant Unit No. 2 Construction Project |
| Location |
About 18 km upstream from Can Tho in South
Mekong Delta |
| Inquiry No. |
2003-166 |
| Loan Scheme |
ODA |
| Date of information
disclosure on JBIC Website |
October 29, 2003 |
| Present
Status of Project |
Loan Agreement was signed on March 31, 2004 |
| Project Outline and Sector
|
Increase of the power supply capability in Mekong Delta,
by constructing a 300MW unit of oil/gas-fired O Mon Thermal
Power Plant, substations, and transmission lines |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
Large-scale thermal power |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
JBIC
press release |
Category B Projects
| Cam
Pha Cement Project |
| Location |
Quang Ninh Province |
| Inquiry No. |
2004-180 |
| Loan Scheme |
IFO |
| Date of information disclosure
on JBIC Website |
November 11, 2004 |
| Present
Status of Project |
Loan Agreement was made on April 12, 2005 |
| Project Outline
and Sector |
Construction of cement factory |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
This project does not fall under the sensitive sectors,
characteristics and regions and thus does not have significant
adverse impact on the environment. |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
EIA |
| Application of New JBIC
Guidelines |
fully applied |
| Additional
Information |
@ |
| Thac
Mo Hydropower Station Extension Project |
| Location |
Thac Mo, South Binh Phuoc |
| Inquiry No. |
2003-167 |
| Loan Scheme |
ODA |
| Date of information disclosure
on JBIC Website |
October 29, 2003 |
| Present
Status of Project |
Loan Agreement was signed on March 31, 2004 |
| Project Outline and Sector
|
To increase the power supply capability (additional
75MW), by extending existing power plant (150MW) on Be
River flowing in Thac Mo, South @Binh Phuoc |
| Reasons for Category Classification
(Based on gIllustrative list of Sensitive Sectors, Characteristics
and Areash of Guidelines) |
There is no change in the size of existing reservoir
and the height of existing dam due to only extending existing
power plant |
| Relevant Documents Available
at JBIC Head Office in Tokyo |
@ |
| Application of New JBIC
Guidelines |
Partially applied |
| Additional Information |
JBIC
press release |
|